Menu

Myrtha Challenges: The Big Rush

August 2016: Rio de Janeiro hosted the world’s greatest sporting event of the last four years.
For the first time in history, the Olympic Games have taken place in a South-American city. Rio has been transformed, with brand-new sporting facilities built next to older ones. And not only in Rio de Janeiro, all of Brazil felt the excitement of the Olympic Games.

 

Of the many training areas built in Brazil’s main cities, Myrtha Pools has designed as many as 9 Centres and a total of 18 swimming-pools, going through tough technical, logistics and functional challenges but getting there first, every single time.

As well as its swimming pools, Myrtha Pools have taken its men to Rio. All through the event, Myrtha’s technical teams have been there to run and service the equipment and pools, offering unfailing assistance and 360-degree expertise.

 

Maria Lenk diving pool and the chromatic change of water: unlock the mistery!

Surf through our booklet online and find out all the pools signed by Myrtha at the Rio 2016 Olympic Games!
READ AND DOWNLOAD THE BOOKLET: RIO DE JANEIRO 2016 OLYMPIC GAMES

 

Request information