7th Street Yucaipa Park pool – Yucaipa

This is a RenovAction of an existing 25 year old concrete plaster pool. The pool was refurbished and brought up to 2012 standards. The pool had a existing diving hopper area which was filled in to re-program the pool depth.
Project Team:  Installation Contractor – DWR Construction, Inc.;   General Contractor – DWR Construction, Inc.;   Aquatic Consultant – Arch Pac Aquatics

7th Street Yucaipa Park pool – Yucaipa
State: USA
Type: Sports and Leisure pool
Accessories: Softwalk® – Safety Floor
Year: 2012
Dimension: 25 m (Lenght)
Structure Type: Outdoor
Technology: Renovaction
Request information