| 1997. The natatory structures of the Sports Center of the capital of Kazakhstan, built around 1960, were closed for the impossibility to have them running, despite of repeated interventions to repair them. Their complete renovation was at that time heartily recommended also by CIO which intended to organize there, once fixed, the I edition of the Central Asia Games. In this case Myrtha Pools took the field with RenovAction Technology, which, using special stainless steel and PVC Myrtha panels, allows for the integral renovation of the pool without demolitions and without modifying its measures.
The 50 m external pool was thereby renovated: new filtration and disinfection systems, pool inside lining with Myrtha RenovAction stainless steel panels, Ceramic/1 overflow gutter on the long sides, starting blocks and all the accessories necessary for the competitions.
In September 1997 has therefore been possible to perform the first Central Asia Games in Almaty Sports Center.
|