On the shores of Lake Neuchâtel in Switzerland, Myrtha Pools has transformed the outdated swimming pool at the municipal school in Estavayer-le-Lac.
Thanks to Myrtha’s exclusive RenovAction technology, lengthy and costly demolition was avoided, giving this teaching pool a new lease of life. The pool has been converted from a skimmer system to an overflow edge on all four sides, improving water circulation and hygiene. Students can now enjoy a pool that is also ideal for aquagym classes thanks to its shallow depth and the antislip bottom.
Engineering Studio: Jenzer + Partner
Tipología de piscina
Ciudad
Estavayer-le-Lac, Suiza
Tecnología
Renovaction
Superficie
15x8,3m
Profundidad
0,85-1,8m
Ubicación
Indoor