Harvard Westlake School - Studio City
This is a replacement of a 8 lane 25 yard pool. It was a Design Build delivery. This project is at a Private School in the LA area.
Project Team: Installation Contractor – DWR Construction, Inc.; General Contractor – DWR Construction, Inc.; Aquatic Consultant – Arch Pac Aquatics.
This is a replacement of a 8 lane 25 yard pool. It was a Design Build delivery. This project is at a Private School in the LA area.
Project Team: Installation Contractor – DWR Construction, Inc.; General Contractor – DWR Construction, Inc.; Aquatic Consultant – Arch Pac Aquatics.