Sciacca Municipal Aquatic Center Italy
This is the case of a continuation of a project started 30 years ago and never finished. The plan was to build an outdoor 50x21m.
Myrtha Pools intervened on the crumbling structure recovering the area disposed by the council and building a 25x21x2m pool. Myrtha Pools redeveloped the area using the Renovaction technology overflow gutter ceramic. The pool is provided with 14 lights, 1 pH and chlorine control unit, 1 heat exchanger, 8 starting blocks and 8 lane marking lines.
This is the case of a continuation of a project started 30 years ago and never finished. The plan was to build an outdoor 50x21m.
Myrtha Pools intervened on the crumbling structure recovering the area disposed by the council and building a 25x21x2m pool. Myrtha Pools redeveloped the area using the Renovaction technology overflow gutter ceramic. The pool is provided with 14 lights, 1 pH and chlorine control unit, 1 heat exchanger, 8 starting blocks and 8 lane marking lines.