Project enquiry

John Hopkins University

The Newton White Athletic Center Natatorium at Johns Hopkins University has been renovated by Myrtha.

After Phase One in 2023, which introduced a stationary Myrtha bulkhead, the project moved into Phase Two, focusing on a complete refurbishment of the pool tank. Thanks to RenovAction technology, the aging concrete pool was upgraded without full demolition, reducing both project time and overall costs. The original tile-lined interior walls were replaced with Myrtha stainless-steel panels, creating a modern, low-maintenance surface.

The bulkhead was also upgraded into a movable system, allowing the pool to shift seamlessly between a 25-yard course, a 25-meter course, a water polo layout, and additional programming needs. The project was developed with aquatic consultant WTI and completed by Myrtha distributor Main Line Commercial Pools.

City

Baltimore, MD, United States

Technology

Renovaction

Surface

115 x 45 ft

Depth

4.8 - 8 ft

Location

Indoor

Accessories

Related projects

All projects