The new swimming pool at Tczew Primary School No. 12 is an important addition to the city’s school and community aquatic infrastructure.
The 25-meter, six-lane pool is the first Myrtha installation in Tczew and supports school swimming, local training, competitions, and learn-to-swim programs for different age groups. Designed by APA Projekt Piotr Lewandowski and delivered by general contractor Przembud, the pool has depths ranging from 1.3 to 1.8 meters. Its layout makes the facility suitable for both educational use and everyday community access, extending its value well beyond the school setting.
The project also has broader significance for future aquatic developments in the area. Following this installation, the investor reconsidered the design of other ongoing projects, moving away from traditional concrete-and-tile construction in favor of Myrtha’s modular stainless-steel technology. Delivered in collaboration with Myrtha’s Official Dealer, Euro Team Trader, the Tczew school pool shows how a first installation can help build confidence in a new construction method, while creating a reliable space for swimming, water confidence, and aquatic sport.
Type
City
Technology
Surface
25 x 15 m
Depth
1,3 - 1,8 m
Location