The Pierre De Coubertin Sports Centre, which has always been the symbol of sporting and competitive life in the town of Massy, has had its aquatic facilities completely renovated under the patronage of the Ministry of Sport, the Olympic Committee and the French Swimming Federation.
The Sports Center Pierre De Coubertin have 3 pools: one ompetition pool, built with Myrtha technology, 51m x 21m with bulkheads and ceramic headwalls. The center hosts also a second competition pool was renovated with RenovAction technology, 25m x 12,50m, equipped with ceramic headwalls and starting blocks, and another RenovAction leisure pool, 12,50m x 10m.
Type
City
Massy, France
Technology
Myrtha technology - Renovaction
Surface
51x 21m (Olympic pool)
25x12,5m (Learn-to-swim pool)
12,5x10m (Leisure pool)
Depth
1,4-2,6m (Olympic pool)
2-3m (Learn-to-swim pool)
Location
Indoor
Accessories