Pool installation

Modular system and easy installation

Installation Timing flexibility

The installation timing of a Myrtha pool is extremely flexible as the entire structure can be installed at whatever point in the construction schedule is best for the project and for the project management team.

This allows the general contractor and the rest of the construction team to execute their total scope of work in the most convenient and safest environment.

 

Expedited Construction Schedule

Myrtha technology has shown that construction timelines for the swimming pool portion of a project is reduced in comparison to conventional concrete/tile pool construction methods. On average, Myrtha technology reduces the construction time for a 50m pool by 8 weeks and a 25m pool by 6 weeks. These time savings translate directly to project cost savings.

 

Installation Timing flexibility

The installation timing of a Myrtha pool is extremely flexible as the entire structure can be installed at whatever point in the construction schedule is best for the project and for the project management team.

This allows the general contractor and the rest of the construction team to execute their total scope of work in the most convenient and safest environment.

 

Expedited Construction Schedule

Myrtha technology has shown that construction timelines for the swimming pool portion of a project is reduced in comparison to conventional concrete/tile pool construction methods. On average, Myrtha technology reduces the construction time for a 50m pool by 8 weeks and a 25m pool by 6 weeks. These time savings translate directly to project cost savings.